







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Kitchen Remodeling in Santa Ana: What to Know First
KraftMaid kitchen remodeling in Santa Ana typically runs $14,000 to $45,000 for a full remodel, with most single-trade jobs (cabinets, countertops, backsplash) finishing in two to six weeks. We work on KraftMaid cabinets that are already in your kitchen, so the quote covers what you have, not a sales pitch for what you don’t. Every price is written and signed before a tool comes out of the van, and a change order has to be signed before any change proceeds.
This page is for Santa Ana homeowners who bought a house with KraftMaid cabinets between 2015 and 2025 and now want to keep the boxes but change the kitchen around them, or repair what’s failing. We’re an independent KraftMaid service provider, not affiliated with or authorized by the manufacturer. Call (833) 853-5955 for a free estimate.
How KraftMaid Products Fail – and How We Fix Them

KraftMaid builds a good cabinet. What we see in Santa Ana kitchens isn’t a defect so much as a wear pattern, and it varies by series. Here’s what actually shows up on our diagnostics, and what we do about it.
- Drawer box separation on the Kirkdale and Fairmont lines. The dovetail joints are sound, but the plywood sides delaminate at the bottom edge after years of a heavy pot drawer pulling against the glide. We rebuild the box or replace the drawer, matching the existing finish, rather than selling you a whole cabinet run.
- Glide and hinge slop on older Cheswick installs. Undermount glides lose tension and the door hinges go soft, so the drawer sags and the door won’t sit flush. KraftMaid sells the correct replacement glide and hinge as OEM parts; we pull the model number off the cabinet, order the exact fit, and swap them. Aftermarket glides are cheaper but often don’t seat in the same screw pattern, which means drilling new holes in your cabinet.
- Finish failure around the sink and range. Santa Ana’s dry inland air and the steam off a busy cooktop drive hairline checking in the paint finish on the stiles closest to moisture and heat. We sand, seal, and refinish in place where the door is salvageable; where it isn’t, we source a matching door.
- Cabinet boxes out of square after a slab shift. Older Santa Ana homes settled on expansive clay soil, and a cabinet run that was level at install can be a half inch out at the toe kick years later. We shim and re-level before any new countertop goes on, because a countertop set on an out-of-square box cracks at the seam within a season.
- Toe kick and end-panel water damage. Slow leaks under the dishwasher rot the toe kick and lower panel before you notice. We open the panel, dry the substrate, replace the damaged piece, and confirm the leak source before reinstalling. Replacing the panel over an active leak is how kitchens get torn out twice.
One detail worth knowing: KraftMaid’s warranty covers the cabinet itself, but the finish and the glides are handled differently depending on the series and the age of the install. We check the model and series sticker inside the door before we recommend anything, so you don’t lose coverage by letting an aftermarket part get screwed into a covered box.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our KraftMaid Kitchen Remodeling Process
Here’s the job from your first call to the day we leave. No mystery steps, no surprise invoice.
- 1
Written price before any work starts. We walk the kitchen, document the KraftMaid series by model sticker, and deliver a flat written price with a written scope and a written warranty. Under Clause 1 of the Haven Standard, that number is the number.
- 2
Diagnostics and parts decision. We photograph the inside of every cabinet, measure the box square, and check the finish condition. Then we make the OEM-versus-aftermarket call in writing: OEM glides and hinges where the warranty matters, quality aftermarket only where it doesn’t and the price savings are real.
- 3
The repair or the remodel. Whether it’s refacing, a full cabinet replacement, new countertops, or a backsplash, the scope you signed is the scope we build. Any change is a signed change order, period.
- 4
Countertop and backsplash sequencing. Countertops are templated after the cabinets are level, not before. Backsplash tile goes on after the countertop is set, so the caulk line is clean and the tile sits against the stone, not floating over a gap.
- 5
Test and punch list. Every drawer opens and closes flush, every door closes without a rub, every outlet and appliance is live. We leave a documented photo record of what we found and what we did.
- 6
Cleanup and the 365-Day Done Right Promise. If something isn’t right within a year, we make it right. That’s backed by the Haven Standard, not a handshake.
See the difference
Before
After
Before
After
Before
AfterWhat KraftMaid Kitchen Remodeling Costs in Santa Ana

These are the ranges we quote in Santa Ana, in dollars, so you can screenshot them and compare. A full KraftMaid kitchen remodel runs $14,000 to $45,000. A small or partial remodel, where you keep most of the boxes and change the faces and counters, lands at $9,000 to $20,000.
- Full kitchen remodeling: $14,000 – $45,000
- Small kitchen remodel: $9,000 – $20,000
- Cabinet installation or replacement: $4,000 – $13,000
- Countertop installation (Cambria or Caesarstone): $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation: $3,000 – $10,000
What moves the price: whether the cabinets are refaced or replaced, the countertop material (a quartz slab runs more than laminate), and whether the layout changes involve plumbing or electrical. We quote against that. Bring a competitor’s written estimate and we’ll review it line by line at no charge, as a free second opinion. Call (833) 853-5955 to schedule your free estimate.
Why Santa Ana Homeowners Call Rowan Construction Group Santa Ana for KraftMaid Work
Because we say what we found and put the number in writing. Our technicians have up to 19 years of experience, and they read a KraftMaid model sticker the way a mechanic reads a VIN: series first, parts second. The written price is there before any work starts, the change order is signed before any change proceeds, and the photo record is included on every visit, not sold as an upgrade.
When a KraftMaid job needs something we don’t stock, we have sourcing depth across fifty-plus vetted brands: Kohler and Toto fixtures, Cambria and Caesarstone countertops, GAF and Owens Corning roofing, PGT and Master Halco for the envelope work around your kitchen. That’s why the number in the written quote is honest rather than inflated. Background-checked, uniformed technicians; a live person answers the phone; the 365-Day Done Right Promise stands behind every job.
FAQs

Not if the cabinets themselves aren’t altered, because the warranty covers the cabinet, not your countertop or tile. Replacing countertops or adding a backsplash over existing KraftMaid boxes doesn’t touch the cabinet coverage. What can affect it is letting an aftermarket glide or hinge get screwed into a covered box, which is why we check the series and model sticker before recommending parts. Call (833) 853-5955 for a free estimate.
Yes, the correct OEM glides and hinges are available, and we order them by the model number on the cabinet. The reason to go OEM rather than an off-the-shelf aftermarket glide is the screw pattern: OEM matches the existing holes, so you don’t end up drilling new ones into the cabinet box. We’ll tell you in writing whether OEM or aftermarket is the right call for your job.
Repair the boxes if they’re square, the finish is sound, and the damage is at the glides, hinges, or toe kick. Replace the faces or the whole run if the finish has checked at the stiles or the boxes are out of square from foundation movement. The honest answer sits in a diagnostic, not a sales pitch, and we put the repair cost and replace cost side by side in writing so you can decide.
A single-trade job (cabinets, countertops, or a backsplash) is typically two to four weeks from signature. A full remodel with cabinet replacement and new countertops runs four to six weeks, longer if plumbing or electrical moves. The written scope includes the schedule, and any change to it goes through a signed change order.
No, the written price is the price unless you sign a change order. That’s the discipline that’s kept our projects within a few percent of the agreed cost, and it’s Clause 1 of the Haven Standard: the price is written before anyone starts. Call (833) 853-5955 for an exact quote, and estimates are free.
Written by the team at Rowan Construction Group Santa Ana, serving Santa Ana and nearby areas.












